Posted: Tuesday 14 September, 2010
It's been a good week. We've had electricians, joiners, the plasterer (who's also the brickie, slater and all round star) and, yesterday and today, the blokes to install the plant for the heat pump. It all looks very complicated and there is a huge pile of technical manuals - I won't be reading them.
The week after next, the ground works for the heat pump loop will be done and a new mains water pipe installed - then the heat pump and plumbing can be commissioned. We've decided to run water into the West range at the same time - seems daft not too.
The Ames taper should be here on Monday and the tiler towards the end of the week, to tile the bathroom. If the kitchen floor is sufficiently dry, then he'll be able to tile the kitchen floor too.
It looks like we MIGHT be in for the end of October, even if all the floors aren't down.